"God so loved the world, that He gave His only Begotten Son, that whosoever believeth in Him should not perish, but have everlasting life."  John 3:16 Contact Us Home

Background
 
Ministries Christian Education Bible Studies Staff Resources Activities Maps Links

Special Interest:

Building Updates

Groundbreaking

Building Committee


Public Worship


Early Worship, 8:00 AM Sunday
Late Worship 10:30 AM Sunday

The sacrament of Holy Communion is celebrated at both services on the First, Third, and Fifth Sundays of the month.


Sunday School, 9:15 AM

  • Small Children's opening
  • Youth classes
  • Adult class

See facilities map for classroom locations.

Nursery is provided for children 3 years old and younger during both worship services and the Sunday School hour.


Gatherings During the Week

  • Ladies Bible Study 9:30 AM Tuesday
  • Men's Study and Game group 7:00 PM Tuesday evening
  • Men's Bible Study 6:30 AM Friday morning

Building Committee

Master Plan

Available here is a PDF file with the final version of the Master Plan for the development of our site on FM 158. This document is a superset of the January 28, 2007 presentation available below - it starts with that material and then continues on with the final Master Plan documents.

Final Version, Bethel Master Plan. Right-click this link to download the file (large, 7.5MB) to your computer.

James Langford Presentation

On January 28, 2007 James Langford presented a summary view of where he was at with developing a site plan for the site on FM 158. Randy Moerbe has summarized his presentation, and it is available here. It is also available in the office as a printed document, along with a DVD of the entire presentation.

James Langford Presentation Summary

Program of Requirements

The draft Program of Requirements (POR) outlines the facility requirements for Bethel Lutheran Church for the next 30+ years. It is the result of several months of investigation and work by the Building Committee in consultation with the congregation in open forums, and provides a basis for developing Bethel's new property on Hwy 158. As the years pass and our space needs evolve, changes will undoubtedly be made to these facility requirements, but it is a starting point. The final approved version is here as well

Draft and Final versions, Program of Requirements

Final Floor Plans

James Langford has provided the latest floor plan drawings for the new building. These PDF files are presented here for convenience. Right-click on the links to download a copy of the drawing to your computer.
Full Lower Level Full Upper Level
Sanctuary Lower Level Sanctuary Upper Level
Education Lower Level Education Upper Level