The
following cost estimate was prepared on unit cost factors based on cost
experience of previous estimates for similar facilities escalated to the date
of bidding.
NOTE: The Project Architect/Engineer is responsible
for implementation of sound architectural and engineering principles in
obtaining the most economical and feasible facility possible. It is emphasized that although certain
construction system maybe described in this POR as a basis of this estimate; the
POR is only a guide for this purpose.
The project Architect/Engineer is expected to consider optional systems
to obtain maximum economy and adaptability to requirements of the project.
Building - Phase
One........................................................................ $ 3,500,000
Site Development.............................................................................. $ 500,000
Total Construction
- Phase One .......................................................... $ 4,000,000
Construction
Contingencies....................................................................
$ 200,000
Design, Project
Management, Inspection, Other Soft Costs.......................... $
500,000
Furnishings and
Equipment ..................................................................... $
50,000
TOTAL ESTIMATED PROJECT COST –
Phase One .............................. $ 4,750,000